
Pakistan’s development challenge is no longer only to expand physical connectivity; it is to make connectivity commercially valuable for firms, workers and consumers. Roads, ports and energy infrastructure can lower the physical cost of reaching markets, but they do not automatically generate export growth, productive investment or stronger participation in global value chains. These outcomes also depend on predictable border procedures, reliable logistics, competitive industrial clusters, capable institutions and firms able to meet market requirements.
This policy viewpoint argues that CPEC 2.0 should treat market access as an explicit performance objective. The proposed approach links infrastructure with customs and trade facilitation, multimodal logistics, special economic zone (SEZ) readiness, SME export capability and measurable accountability. The World Bank’s World Development Indicators place Pakistan’s exports of goods and services at about 10.4% of GDP in 2024, illustrating the economy’s limited export orientation; this is a macroeconomic indicator, not by itself proof that CPEC infrastructure has failed or that CPEC caused the trend.
The paper recommends a phased programme: (i) within 12 months, establish a common market-access scorecard, validate baselines and assign named agency owners; (ii) over 1–3 years, remove priority customs, logistics and SEZ bottlenecks through service standards and coordinated delivery; and (iii) over 3–5 years, evaluate outcomes and scale only those interventions that demonstrate results. Success should be judged by measurable changes in clearance time, logistics reliability and cost, operational SEZ performance, firm-level export participation, export diversification and investment—not by infrastructure completion alone.
CPEC’s first phase expanded important elements of Pakistan’s transport and energy infrastructure. This has created assets that can support domestic integration and external trade. Yet infrastructure is an enabling condition rather than a sufficient condition for competitiveness. A road or port produces broader economic gains only when firms can use it reliably, at a competitive total cost, and connect it to customs, warehousing, production, finance and destination markets.
Pakistan’s export-to-GDP ratio remains low. World Bank data indicate exports of goods and services were approximately 10.4% of GDP in 2024. The indicator includes both goods and services and should not be confused with merchandise exports alone. Pakistan’s merchandise exports reached approximately US$32.1 billion in FY2024–25, according to Pakistan Bureau of Statistics figures reported by Associated Press of Pakistan. These figures describe different measures and periods and should not be combined as if they were the same series.
The policy question is therefore not whether connectivity investments matter, but how public institutions can ensure that the resulting network lowers trade costs and helps firms reach customers. Four constraints deserve particular attention: fragmented agency processes; uneven border and customs performance; incomplete logistics links between production areas and gateways; and SEZs that may be designated or developed without all utilities, services and export-oriented firms being operational.
Read More: A Decade of CPEC – Building Connectivity and Regional Integration
China should also be seen as an export market, not only as a source of investment, technology and infrastructure cooperation. The China–Pakistan Free Trade Agreement Phase II gives Pakistani exporters preferential access, with tariff concessions applied from 1 January 2020 and duty-free entry for 313 tariff lines of particular export interest to Pakistan. These preferences will not convert into sales automatically. Firms need better product quality, standards compliance and certification, sufficient production capacity, market intelligence and direct buyer links. CPEC 2.0 should therefore connect corridor and zone development with specific export opportunities in the Chinese market.
Market access is the ability of a firm to reach domestic and international customers reliably, predictably and at a competitive delivered cost. It depends on the full journey from production site to buyer—not just distance or road quality.
Infrastructure → Transport Connectivity → Logistics Reliability → Trade Facilitation → Market Access → Firm Productivity → Export Competitiveness
The framework implies that government should identify the binding constraint along each priority trade route and industrial cluster before committing to additional capital spending. For one firm, the constraint may be an unpredictable border delay; for another, it may be the lack of reliable electricity, freight services, cold storage, standards certification or access to working capital. Policy should be designed around these bottlenecks and verified through firm-level evidence.
Digital declarations and risk-based inspections can reduce avoidable processing and improve predictability, but performance should be measured using current, route-specific data. FBR reported in 2021 that documentary and border-compliance times had fallen to 24 hours for specified import and export measures; these historical figures are not a current nationwide guarantee. Pakistan Single Window’s FY2024–25 annual monitoring report records preparatory work for a Time Release Study, including study design and data requirements. The study’s validated results should be used when available to establish current baselines.
Priority actions are to publish the latest validated Time Release Study results, extend interoperable digital processes across relevant agencies, publish service standards and report exceptions. Performance measures should distinguish documentary compliance, customs release, other-agency release and total cargo dwell time.
Roads, railways, dry ports, ports and border crossings should be planned as a connected logistics system. A rail service will not attract freight simply because rail transport can be cheaper over some distances: shippers also require schedule reliability, suitable terminals, predictable wagon availability, competitive handling charges and last-mile connections. Before setting a national rail-freight target, the responsible agencies should establish a consistent baseline for freight tonnes, tonne-kilometres, modal share, service reliability and end-to-end cost.
A practical first step is to select a small number of high-volume freight flows—such as port-to-industrial-cluster routes—and compare road and rail on total delivered cost, transit time, reliability and emissions. Expand services only where the commercial case and shipper demand are demonstrated.
Read More: Agricultural Growth and Collaboration through CPEC
An SEZ should be judged by operational readiness and firm performance, not only by land allocated or investment announced. Relevant conditions include reliable electricity and gas, water and wastewater treatment, worker transport, digital connectivity, customs support, predictable approvals and effective investor aftercare. Zone-level reporting should separate announced investment from financial close, construction, commercial production, employment, domestic sourcing and exports.
The recommended approach is to prioritise a limited number of zones where infrastructure and investor demand can be brought together quickly. Each zone should have a public readiness plan with named owners, milestone dates, utility dependencies and an investor grievance mechanism. New commitments should be sequenced against evidence of demand and implementation capacity.
Market access cuts across federal ministries, provincial departments, regulators, ports, customs, transport operators and zone authorities. A new coordinating body is not necessarily required; the immediate need is clear end-to-end accountability, agreed service standards and a mechanism to resolve cross-agency blockages. The existing CPEC governance arrangements should be used where possible, with a designated lead for each deliverable and escalation to the appropriate committee when milestones are missed.
Exporters, manufacturers, freight forwarders, shipping lines, SME associations and zone investors should be consulted through structured quarterly sessions. Each session should produce a short issue log identifying the constraint, responsible agency, agreed action, deadline and resolution status. This will make private-sector consultation a problem-solving mechanism rather than a one-off event.
International experience is most useful when treated as a set of principles to test against Pakistan’s institutional and commercial conditions—not as a model to copy wholesale.
| Experience | Relevant principle | Application to CPEC 2.0 | Source |
|---|---|---|---|
| China’s SEZ development | Concentrate implementation capacity and link zones to infrastructure, services and industrial demand. | Prioritise a small number of ready zones; publish utility and investor-service milestones before scaling. | World Bank: Special Economic Zones |
| Vietnam’s export manufacturing | Connect investment attraction with export-oriented value chains and market access. | Select realistic target sectors and link firms to standards, skills, suppliers and destination markets. | World Bank: Connecting Value Chains |
| Kazakhstan and the Middle Corridor | Transit competitiveness depends on coordinated procedures and reliable connections across the full route. | Measure end-to-end transit time and reliability; coordinate border agencies and neighbouring corridor partners. | World Bank: Middle Corridor |
| Malaysia and Thailand’s industrial corridors | Infrastructure, investor services and industry development work best as an integrated package. | Align freight nodes, zone services, skills and investment facilitation from the outset. | Hill and Menon: Economic Corridors |
| Georgia’s transit facilitation | Border and port procedures can materially affect corridor attractiveness. | Simplify procedures where risk permits and publish transparent, predictable service standards. | World Bank: Trans-Caucasus Corridor |
These examples support a common lesson: infrastructure, trade facilitation and industrial policy should be planned together. The appropriate policy transfer is the operating principle, not an unsupported claim that another country’s outcomes can be replicated automatically.
| Risk | Practical mitigation | Early warning indicator |
|---|---|---|
| Fiscal constraints and unfunded utilities | Prioritise low-cost process reforms; sequence capital projects against verified demand and lifecycle costs. | Milestones delayed for lack of approved funding; utility projects without financing plans. |
| Fragmented mandates | Assign one accountable owner per deliverable; document agency dependencies and escalation deadlines. | Repeated missed milestones or unresolved inter-agency issues. |
| Political and administrative turnover | Embed scorecard reporting in existing official review mechanisms and maintain a documented action log. | Targets or reporting routines discontinued after transfers or leadership changes. |
| Security risks and weak local inclusion | Coordinate with relevant authorities and communities; include local hiring, grievance handling and transparent security protocols. | Investor complaints, disruption incidents or unresolved community concerns. |
| Weak data and inconsistent definitions | Publish metadata, definitions, coverage and revision dates; independently validate baselines where feasible. | Conflicting values across agencies or missing quarterly submissions. |
| Insufficient private-sector demand | Require market sounding and credible shipper/investor commitments before scaling infrastructure or zone incentives. | Low utilisation, delayed financial close or weak firm-level exports. |
| Timeframe | Priority action | Lead / supporting institutions | Deliverable and KPI |
|---|---|---|---|
| First 6 months | Approve a CPEC market-access scorecard and definitions; establish baseline values and data owners. | Planning Commission / CPEC governance; PBS, FBR, PSW, Railways, port and SEZ authorities. | Approved indicator dictionary; named data owners; baseline report with source and date for each measure. |
| Within 12 months | Publish current Time Release Study findings and customs service standards; establish a quarterly trade bottleneck log. | FBR / Pakistan Customs / PSW with other border agencies and private-sector representatives. | Publication of validated clearance-time measures; share of agencies reporting; number and age of unresolved bottlenecks. |
| Within 12 months | Conduct readiness audits for priority SEZs and publish corrective action plans. | Relevant provincial SEZ authorities, BOI, utilities and zone developers. | Zone-by-zone status of utilities, approvals, investor services and commercial operations. |
| Years 1–3 | Pilot end-to-end logistics improvements on selected freight flows; compare road/rail costs, time and reliability. | Ministry of Communications, Railways, port authorities, NHA and private operators. | Baseline and post-pilot data on total cost, transit time, reliability and utilisation. |
| Years 1–3 | Launch an SME export support package linked to real buyer requirements, standards, finance and logistics. | TDAP, SMEDA, relevant ministries, banks and business associations. | Number of supported firms that begin or expand exports; repeat exporters; markets and products reached. |
| Years 3–5 | Evaluate results and scale interventions that show measurable improvements; discontinue or redesign ineffective measures. | Planning Commission and relevant oversight forums, supported by independent evaluation where feasible. | Annual public scorecard and evaluation of costs, outcomes and corrective actions. |
A scorecard should use indicators with clear definitions, a named source, a reporting frequency and an accountable data owner. It should distinguish outputs (for example, a digital module launched) from outcomes (for example, shorter and more predictable clearance times) and economic impacts (for example, higher firm exports). Targets should be set only after the baseline is validated; inventing targets before confirming current performance would weaken accountability.
| Indicator | Definition / reporting rule | Proposed source | Frequency |
|---|---|---|---|
| Exports of goods and services as % of GDP | Use one consistent World Development Indicators series; identify revisions and distinguish from merchandise exports. | World Bank WDI / national accounts | Annual |
| Merchandise exports | Current US dollars and growth rate, using the same PBS trade series each year. | PBS | Monthly / annual |
| Customs and border release time | Separate documentary compliance, customs release, other-agency release and total cargo dwell time; publish method and sample coverage. | PSW Time Release Study / FBR | Annual, with quarterly operational updates where available |
| Logistics reliability and cost | Track selected route-level door-to-door time, variability, and cost per shipment or tonne; do not use a single unverified national cost-to-GDP figure. | Transport operators, shippers, port and rail authorities | Quarterly |
| Rail freight performance | Report tonnes and tonne-kilometres separately, plus modal share where a consistent denominator exists. | Pakistan Railways / Ministry of Railways | Quarterly / annual |
| SEZ operational performance | Report operational firms, jobs, realised investment, exports, utility reliability and occupancy using explicit definitions. | SEZ authorities / BOI / PBS where available | Quarterly |
| Export diversification | Use a stated concentration index and consistent product/market classification; report method and data year. | PBS / World Bank WITS or UN Comtrade | Annual |
| SME export participation | Count firms that export, first-time exporters and repeat exporters, with confidentiality safeguards. | TDAP / SMEDA / relevant administrative data | Annual |
The scorecard should be published annually, with a short quarterly implementation dashboard for actions under direct government control. Where a series is unavailable or not comparable, the scorecard should state “baseline to be established” rather than insert an estimate without a defensible method.
Read More: Gwadar’s Strategic Role in CPEC and the Belt & Road Initiative
Read More: BRICS and the Changing Architecture of Global Finance
CPEC has expanded infrastructure that can support Pakistan’s domestic integration and international trade. The next phase must focus on the systems that turn these assets into economic value: predictable customs, reliable multimodal logistics, operational SEZs, export-capable firms and accountable institutions. Physical connectivity is necessary, but its economic return depends on how effectively firms can use it.
A practical market-access agenda does not require a new layer of institutions or an unverified catalogue of ambitious targets. It requires validated baselines, clear agency ownership, a limited set of commercially grounded pilots, measurable service standards and regular public reporting. CPEC 2.0 should therefore be judged not only by what is built, but by whether it helps Pakistani firms reach markets more reliably, compete on delivered cost and expand sustainable exports.
Mujtaba Arshad is a Research Associate at the Centre of Excellence for CPEC (CoE-CPEC), Pakistan Institute of Development Economics (PIDE), Islamabad. He holds an MPhil in Economics from Quaid-i-Azam University, Islamabad, where he secured second position in the Economics Department. His research focuses on regional connectivity, economic integration, trade facilitation, maritime logistics, export competitiveness and industrial development under CPEC Phase II. His work examines how transport infrastructure, border management, logistics systems and special economic zones can support Pakistan’s integration into regional and global value chains. He has published policy analysis and commentary on CPEC, Gwadar, regional trade corridors, industrial development and Pakistan’s economic transformation in national and international media. His research interests include evidence-based policy design, measurable implementation frameworks and practical reforms to strengthen Pakistan’s trade and investment performance.
Our latest analysis, upcoming events and calls for researchers, in your inbox twice a month.
New analysis from IPDS research centres, invitations to our dialogues and events, and opportunities for researchers. Twice a month, free, and you can leave with one click.